56 PJU Lamps Installed on KBB Inspection Road
Reported by Wuri Setyaningsih | Translated by Maria Inggita
Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.
There are 56 LED Smart System lamps installed
"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).
According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.
KBB Arrangement Socialization Phase Has Been Done"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.
PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.